
New TopShim run:

version = topshim 2.1.0
date = 2021-10-01
time = 13:04:14.322
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0168
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 1.0 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration 2: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration 3: FWHM Before= 0.8 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration 4: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration 5: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.9 Hz
Iteration 6: FWHM Before= 0.9 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration 7: FWHM Before= 0.4 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, non-spinning) = 0.708

shim changes: 
Z	+218
Z2	+117
Z3	-26
Z4	+202
Z5	-63
Z6	+1212
Z7	-1369
Z8	-1297

duration = 2 min 21 sec
completed successfully
finished Fri Oct  1 13:06:33 2021


========================================================================
